BauKG maintenance documentation after a change of owner: features and storage

Maintenance file under section 8 BauKG after a change of owner: content, updates, handover and storage for later work on the building.

BRANDAUER Rechtsanwälte
Your law firm

BRANDAUER Rechtsanwälte

Salzburg law firm for real estate, construction and corporate law

Every matter is handled by a coordinated team of lawyers, legal staff and specialists. In construction cases we look at contract, evidence, deadlines and commercial consequences together.

26 September 2026 · Mag. Bernhard Brandauer, Rechtsanwalt

A building needs a dedicated file for later work that remains useful beyond the construction phase. Section 8 of the Austrian Construction Work Coordination Act, or BauKG, requires the building owner to ensure that the file is prepared, updated when changes occur and stored appropriately for the life of the building.

The file contains building characteristics that workers must take into account to protect safety and health during use, maintenance, upkeep, alterations or demolition. Examples include access points, anchor points, scaffold anchoring points and gas, water or electricity lines.

If the building is handed over during construction or after completion to another natural or legal person or to another company with legal personality, that recipient must ensure storage of the file. This article explains its content, updating and handover, and distinguishes it from the construction file, general coordinator appointments and a warranty review of the construction work.

Assess your situation

What needs to be clarified about the maintenance file?

Answer two questions for an initial orientation on content, updates and storage under section 8 BauKG.

Already know you want to get in touch? Go straight to the enquiry form.

01 Question 1

What stage is the building in?

Section 8 BauKG accompanies preparation, construction and the later use of the building.

All paths at a glance

Overview of all answers.

01

The file is organised and can be prepared for handover.

Create a clear version overview and record where the current file is stored. Arrange technical plans, access information, anchor points and utility-line information so that later work can be prepared safely.

At handover, the new owner should receive a traceable record of the storage location and practical access to the file.

02

Missing or outdated information should be compared with the actual building state.

Compare the file with the progress of the works and any changes. Add the building characteristics relevant to later use, maintenance, upkeep, alterations or demolition.

Assign each update to a plan status and a traceable reason for the change. This keeps the information that later work must take into account identifiable.

03

Storage and handover need a clear record that remains accessible over time.

Record who stores the file, which version is current and how later responsible persons can access it. When the building is handed over, pass on the storage information together with the file.

The transfer of the storage duty under section 8 BauKG addresses custody of the document. Other legal questions arising from the transfer of ownership require a separate review.

What the file under section 8 BauKG is for

Section 8(1) BauKG requires the building owner to ensure that a file for later work on the building is prepared. The duty therefore concerns a document that supports safe work on the completed building or on a building that is later altered.

The purpose follows from section 8(2) BauKG. The file must record those characteristics of the building that workers need to take into account during later work. The provision identifies use, maintenance, upkeep, alteration work and demolition as examples.

The file therefore describes safety-relevant features of the particular building. A general collection of project documents serves this purpose only when the information relevant to later work can be found and understood within that collection.

Which technical information belongs in the file

Section 8(2) BauKG requires information about building characteristics needed to protect safety and health during later work. The provision expressly mentions access points, anchor points and scaffold anchoring points. It also names gas, water and electricity lines.

For practical use, assign each item to the relevant building part and plan status. A company carrying out later work should be able to identify an access point, locate an anchor point and understand which utility route must be considered before work begins.

The provision does not prescribe a particular file format. A digital file, a set of plans or another suitable form of documentation may be sufficient where content, currency and access are reliably organised. If several versions exist, mark which version is current.

When the file must be prepared and updated

Section 8(3) BauKG requires the file to be prepared during the preparation phase. Safety information should therefore be incorporated into planning before later work on the building has to be organised under more difficult conditions.

Section 8(4) BauKG requires updates as the works progress or when changes occur. This includes changes to the building or its technical features that matter for later use, maintenance, upkeep, alteration work or demolition.

Section 8(5) BauKG requires the file to be taken into account during both the preparation and execution phases. The documentation should therefore be compared with construction progress and should continue beyond an early planning status.

What happens to storage after a change of owner

Section 8(6) BauKG requires the building owner to store the file appropriately for the life of the building. The storage duty is designed to keep the information usable over the long term.

If the building is handed over by the building owner during construction or after completion to another natural or legal person or to another company with legal personality, that recipient must ensure storage of the file. The transfer is linked to the handover of the building.

A practical handover record should state the version, date, recipient and storage location. Section 8(6) BauKG regulates storage of the file. The other rights and duties connected with a transfer of ownership depend on the contracts and the remaining applicable provisions.

How the file differs from the construction file and a warranty review

A construction file generally collects documents about the building procedure, permits, plans, decisions and execution. The file under section 8 BauKG has a separate purpose: it brings together the characteristics required for safe later work. Individual plans or findings may appear in both records, while their functions remain different.

The appointment of a safety and health coordinator addresses another question. It concerns coordination during the legally relevant construction phases. The maintenance file is directed at information that must be considered during later work on the building.

The file also does not replace a warranty review of the construction. Whether the building was completed defectively, which claims exist and how evidence should be preserved requires a separate technical and legal assessment. Further information on evidence in construction disputes is available in the construction litigation and evidence topic.

Review points

Assess content, timing and handover separately

The overview separates the questions surrounding the file under section 8 BauKG.

Reviewing the maintenance file under section 8 BauKG
Review point What it concerns Useful evidence
Content Which building features matter? Describe access points, anchor points, scaffold anchoring points and utility lines so they can be found. Plans, technical information, building-part references
Timing When was the file prepared and updated? Show the preparation phase, construction progress and changes in sequence. Versions, change notes, plan statuses
Handover Who receives the building and the information? Record recipient, date and the version handed over. Handover list, contract, receipt
Storage Where will the file remain accessible during the life of the building? Secure a suitable storage location and access for later work. Filing record, access rule, current version

Section 8 BauKG governs content, updates and storage. The technical documentation depends on the features of the particular building.

Process

From planning to reliable storage

Continuous documentation keeps the information usable for later work.

  1. 01
    Preparation

    Record the features

    Capture safety-relevant access points, anchoring points and utility lines during planning.

    Assign the information to building parts and plans. This creates a usable basis for later work.

  2. 02
    Execution

    Compare construction progress

    Add changes and new technical information to the file.

    Review the file as the works progress and after changes. Mark the current version.

  3. 03
    Handover

    Pass on the current version

    Record recipient, date, version and storage location together.

    Hand over the file with a short list of documents. The storage location must be findable for later use.

  4. 04
    Life of the building

    Keep access available

    Store the file appropriately for the life of the building.

    Keep the current version accessible and update it where later changes affect safety-relevant building features.

Practical tip: At handover, prepare a short document list with version, date, recipient and storage location. You can subscribe to BRANDaktuellen Rechtsnews for ongoing articles and legal information. If you would like to discuss the legal assessment of your building project, you can book an initial consultation (72 euros).

FAQ

Maintenance file under section 8 BauKG after a change of owner

Who must ensure that the file for later work is prepared? +

Under section 8(1) BauKG, the building owner must ensure that a file for later work on the building is prepared. It should contain safety-relevant features for later use, maintenance, upkeep, alteration work or demolition.

Which information does section 8 BauKG expressly mention? +

Section 8(2) BauKG mentions access points, anchor points, scaffold anchoring points and gas, water and electricity lines. The relevant features are those of the particular building that must be considered to protect safety and health during later work.

Must the file be updated when changes occur? +

Yes. Section 8(4) BauKG requires the file to be updated as the works progress or when changes occur. The version should be compared with the actual building state and relevant plan statuses.

Who stores the file after a change of owner? +

The building owner must store it appropriately for the life of the building. If the building is handed over during construction or after completion to another natural or legal person or to another company with legal personality, that recipient must ensure storage.

Topics
BauKGmaintenance filechange of ownerlater workstoragebuilding owner

Defects, a remuneration dispute, looming litigation?

In construction law, deadlines and evidence decide. Call us directly or send an email, callback within one business day.

Contact

A direct line to the firm.

Address

BRANDAUER Rechtsanwälte GmbH Giselakai 51 5020 Salzburg